For Architects & Interior Designers

One place for every
project decision.

From design through construction closeout.

Drawings, field observations, RFIs, specs, and budget — connected.
Not scattered across email, text, and Dropbox.

Studio
SC
246 Clinton Street  ·  Brooklyn Renovation Active
Overview
Design
Timeline
Field
Financials

246 Clinton Street

Type
Residential Renovation
Phase
Construction
Client
Sarah & James Chen
Contractor
Urban Core GC
High Priority
Verify kitchen fixture lead times — order at risk
Due Nov 20 · Linked to Kitchen Package
Submit DOB close-in inspection request
Due Nov 22 · Owner: Designer
Budget
$487,200
of $650,000 total
74.9% allocated
Team
SC
Sarah Chen
Designer
MW
Marcus Webb
Contractor
JC
James Chen
Client
Before
Rev 3 sent via email.Email
"Site is on Rev 2, just FYI"Text
Can you check the fixture spec?iMessage
Photo of cracked tile — floor 2WhatsApp
Updated schedule attachedEmail
"Did that RFI ever get answered?"Call
After
Drawings — Rev 3Current
RFI 014 — Wall framingOpen
Waterworks SinkOrdered
Cracked tile — Floor 2Assigned
Schedule — Week 8On Track
Final walkthroughNov 28

From fragments to clarity.

Construction site — framing and drawings
01 — Site

On site.

Something happens. A question, a conflict, a condition that wasn't on the drawings. The real project lives here.

New Field Observation
Issue
West wall framing — 3" off plan
Location
Level 2 · Living Room
02 — Capture

Captured.

Log it immediately. Issue, location, photo. No more "I'll remember this" or texts that get buried.

RFI Log — 246 Clinton
West wall framing — 3" off plan
Assigned → Marcus Webb (GC) · Due Nov 18
Open
Kitchen soffit height confirmation
Marcus Webb · Closed Nov 12
Resolved
Plumbing rough-in — master bath
Assigned → Engineer · Due Nov 20
Open
03 — Assign

Assigned.

Every issue has an owner. Every owner has a due date. No more chasing down who said what.

Spec Schedule — Plumbing Fixtures
Item Status Owner
V+A Barcelona Tub
Master Bath
Approved Designer
Waterworks Henry Sink
Kitchen
Ordered Designer
Kohler Shower Valve
Master Bath
Spec'd Contractor
04 — Track

Tracked.

Spec schedules, procurement status, owner assignments — all in one place, always current.

Punch List · Close-out
Touch-up paint — hallway corner
Closed Nov 24
Done
Cabinet hardware — 3rd drawer misaligned
Closed Nov 25
Done
Final walk-through sign-off
Scheduled Nov 28
Pending
05 — Resolve

Resolved.

Punch list to closeout. Every item logged, owned, and closed. Nothing falls through.

Drawings. Field. Decisions.
Aligned.

One place.    Everything connected.

Faster than a text.

If it takes longer than sending a message, no one uses it. We built for speed first.

Join the waitlist

Early access is limited. Currently onboarding design practices one at a time.